地下建筑物的沉降止水缝如在设计施工中考虑不周,措施不善,常会发生渗漏水的现象。这里介绍我们在1977年3月完成的十二区高桩码头皮带机装卸通道工程中,钢筋混凝土通道在码头与驳岸连接处的沉降止水结构。
Subsidence of underground structures such as sealing cracks in the design and construction of ill-considered, poor measures, often the phenomenon of leakage of water occurs. Here is a description of the settlement sealing structure of the reinforced concrete channel at the juncture of dock and revetment in the belt loading and unloading tunnel project of the 12th-zone piled wharf completed in March 1977.