关于电力建设施工部门几个有关发展方向与内部建设的问题

来源 :水利与电力 | 被引量 : 0次 | 上传用户:y1271
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1959年全国电力建设施工会议文件电力建设的施工部门在国家电力建设的艰巨任务中,担负着极其重大的责任。几年来这个部门在实际锻炼中积累了一定的经验,在全国范围内,已经逐渐形成一支适合电力建设业务特点,胜任电力建设发展任务的专业队伍。自从1958年全国工业体制改变,基建力量下 The National Electric Power Construction Conference of the People’s Republic of China in 1959 documented the construction of the electric power construction department and shouldered extremely important responsibilities in the arduous task of national power construction. In the past few years, this department has accumulated certain experience in practical training. Within the country, it has gradually formed a professional team that is suitable for the characteristics of electric power construction and is qualified for the task of electric power construction and development. Since the national industrial system changed in 1958, under the infrastructure
其他文献
全国机械工业新年新跃进广播大会期间,机床与工具工业各红旗单位代表举行了座谈会,介绍了许多在企业工作中大搞群众运动的先进经验。本刊特在这里刊出几个厂的代表的发言,供大家
山东黄台发电厂为了保证冬季人身设备的安全生产,正积极抓紧进行防冻工工。为了切实做好这一工作,这个厂认真总结了以往几年来在防冻工作方面的经验教训,在厂长和总工 In o
在锻锤旁辛勤劳动30多年的崔庆山,是綦江汽车配件厂锻压弹簧车间的技师,共产党员,曾连续被评为全国、省、市先进生产者,58年出席了世界工会工人代表大会。这次他又被选为代
新厂新设备、工人自编规程唐山发电厂制订新设备规程,是采取领导提出要求,把任务交给工人,分别编写,领导参加,群众讨论,领导再批准的办法。从他们制订的规程来看,编的快,质
在济南第二机床厂翻砂车间里,原来埋怨原料质量不好,因而对提高产品质量没有信心的人,现在心悦诚服地承认自己的看法片面了。因为这个车间在五月份原材料基本没有改变(到25
铸锻件的生产,特别是大型铸锻件的生产,几年来一直是不能满足机械加工需要的。大躍进以来,这个问题更加突出,更加尖锐了,要解决这个矛盾,除了充分发挥老厂的生产潜力外,只有
勇敢斗争在江口水库上的安义县青年:江西省江口水力发电站工地上担任筑坝任务的安义县民工团中的青年,为了保证按期完成任务,10月1日前发电,在党和团总支的领导下,提出“鼓
1958年12月21日深夜,下车室与台板組合体就位,到12月30日午间起动,并带5,000瓩負荷,机組起动試运过程中,真空系統严密性試驗、各式水泵和主体設备都是一次起动成功。第四瓦
一、我国生产的木工机械还没有统一的型号,有的采用本厂编号,有的采用各种各样的参考型号,造成了生产和使用方面的极大不便。为此特制订我国木工机械型号编列办法(附件一)。
吉林热电厂6号机,从4月17日低压下车室就位到5月15日达到发电要求(由于静子未到不能发电)一共只用了28天。这是贯彻党的指示,开展以技术革新和技术革命为中心的群众运动,全