邢台矿选煤厂重介选煤系统工程于 2 0 0 1年 6月 8日竣工投产。邢台矿选煤厂于 1 974年投产 ,设计入洗原煤能力 60 0kt a ,后经技术改造 ,能力达到 90 0kt a。由于选煤能力不能适应矿井原煤产量的增长和市场对煤质的要求 ,该厂于 2 0 0 0年开始新建由唐山煤炭研究分院设
The heavy medium coal preparation system project of Xingtai Coal Preparation Plant was completed and put into operation on June 8, 2001. The Xingtai Coal Preparation Plant was put into production in 1974. It was designed to wash raw coal capacity of 60 0kt a and was later upgraded to a capacity of 90 0kt a. As the coal preparation capacity cannot meet the growth of coal production in the mine and the market’s requirements for coal quality, the plant will be built by the Tangshan Coal Research Institute in 2000.