对常规水电站的水能设计,我们已有一套习惯的方法:通过未考虑调峰能力制约的电力电量平衡,检验水电站的电力电量效用,使设计水电站与具有同等电力电量效用的替代电站相比较,从而评价水电站的经济性。这种方法虽比只计电量。不计电力效用的方法合理,但仍然没有充分反映水电的调峰效益。因调峰不仅要有装机容量以保证电力平衡,还要具备足够的调峰能力,若延用这种方法去评价抽水蓄能电站,影响其评价结论。笔者提出改进这套习惯的水能设计方法,补充有关调峰能力方面的分析内容供讨论。
We have established a conventional method for water power design of conventional hydropower stations by checking the power utility of hydropower stations through the balance of power and power without considering the peaking capacity constraints and comparing the design of hydropower stations with alternative power plants with the same power utility effect. Thus evaluating the economy of the hydropower station. Although this method only than the power. Regardless of power utility method is reasonable, but still does not fully reflect the hydropower peak regulation benefits. Because of the peak load not only have installed capacity to ensure the balance of power, but also have enough ability to adjust the peak, if extended use of this method to evaluate pumped storage power station, affecting the evaluation conclusion. I propose to improve this set of habits of water energy design methods, to supplement the analysis of peak capacity for discussion.