接黄河三门峡工程局(60)黄三计字第398号函称:根据水利电力部(60)水电计秘字第20号文,三门峡水库1961年汛前移民水位已经中央确定为海拔337米高程,要求我省据此安排移民工作,并将1961年年度移民计划于11月底以前寄该局,以便汇总上报审批。为此,希你专按上述要求,统一部署安排移民清库工作,转知水库有关县利用今冬农闲季节抓紧做
Yellow River Sanmenxia Engineering Bureau (60) Huangsanjiguan No. 398 According to the letter from Ministry of Water Resources and Electric Power (60), the water level of the Sanmenxia Reservoir before the flood season in 1961 has been determined as an elevation of 337 meters , Requiring our province to arrange resettlement work accordingly, and send the 1961 annual resettlement plan to the bureau by the end of November for submission to the examination and approval. To this end, I hope you specifically according to the above requirements, unified arrangements for clearing resettlement resettlement work, transfer to the reservoir related counties to take advantage of this winter slash season to seize