原SS_3电力机车司机室侧窗部分,由一个固定的三角窗和一个活动推窗组成(见图1)。活动侧窗安装在由型材和压型钢梁组焊成的框架结构表面上。为了保证活动推窗的安装质量,在1400×1000mm范围内,要求表面平整;同时要求侧窗安装底梁焊后表面平直。实际上,由于司机室钢骨架系复杂的空间结构,在骨架焊装后,常因焊后收缩引起一定变形,焊装的侧窗底梁经检查,挠曲不平甚至大到6mm。而该安装面在司机室内侧无法进行机加工,采用砂轮机磨削花费工时多。原SS_3活动侧窗结构复杂(图2),由近四十种、上百个零部件组装构成,设计图纸近
The original SS_3 electric locomotive cab side window section, consists of a fixed triangular window and a movable push window (see Figure 1). The movable side window is mounted on the surface of the frame structure welded by profile and profiled beam. In order to ensure the installation quality of activities push the window, in the range of 1400 × 1000mm, requiring a smooth surface; at the same time require the installation of side sill rear beam welding surface straight. In fact, due to the complex space structure of the steel structure of the driver’s cab, some deformation often occurs after the welding of the skeleton due to the shrinkage after welding. The welding of the side sill has been checked and the deflection is even as large as 6 mm. However, the mounting surface can not be machined inside the driver’s cab, and grinding using the grinder takes a lot of man-hours. The original SS_3 active side window structure is complex (Figure 2), by the nearly forty, hundreds of components assembled, the design drawings near