以齐热哈塔尔水电站工程Ⅰ标段引水隧洞和1#施工支洞的施工工程为例,在该工程施工的过程中,随着洞挖工作的逐步推进,洞身埋深不断加大,地应力逐步增高,岩爆现象随时都有可能发生,为了确保施工过程的安全,根据工程经验和已经开挖洞段实际发生的岩爆综合分析,对引发岩爆的因素进行了分析,并提出了相应的处理措施,以期为之后的施工作业提供强有力的基础,确保安全施工。
Taking the construction of water diversion tunnel and water diversion tunnel of No.1 section of Qi’er Qatar Hydroelectric Power Station project as an example, during the construction of this project, with the gradual advancement of hole excavation, In order to ensure the safety of the construction process, according to the engineering experience and the comprehensive analysis of the rockburst that actually occurred in the excavation section, the factors causing the rock burst are analyzed and put forward The corresponding treatment measures, in order to provide a strong foundation for the subsequent construction operations to ensure safe construction.