论文部分内容阅读
嘉兴发电厂三期工程建设两台1000MW超超临界燃煤发电机组,由浙江省能源集团控股建设,2011年6月和10月建成投产,是中国电力建设全过程质量控制、绿色施工和新技术应用的“三示范工程”。该工程共获得省部级以上奖项80余项,其中专有技术16项、实用新型专有技术10项、国家级工法2项、国家级QC成果2项、全国工程建设项目优秀设计成果一等奖等。依托该工程,业主单位是中施企协授予的2012年度全国科学技术创新先进企业中唯一的电力企业。
Jiaxing Power Plant Phase III Construction of two 1000MW ultra-supercritical coal-fired generating units, controlled by the Zhejiang Provincial Energy Group Construction, completed in June and October 2011, is the entire process of China’s power quality control, green construction and new technologies Applied “Three Demonstration Project ”. The project received a total of more than 80 provincial and ministerial-level awards, of which 16 proprietary technology, utility model proprietary technology 10, 2 national-level workmanship, 2 national-level QC results, outstanding design results of the national engineering construction projects Award and so on. Relying on the project, the owner unit is the only power enterprise in the 2012 National Science and Technology Innovation Advanced Enterprise granted by the Association of Enterprises of China.