原件:关于××110KV输变电工程增加投资的申请报告××电力公司:我局农网二期建设改造工程,××110KV输变电工程项目,为与××城市总体规划相配套,市政府及市规划土地管理局要求该站110KV进线自北塔路北侧以110KV电缆入地至变电站内,长度约580米,由此引起该站投资较原科研报告投资增加284万元(110KV电缆
Original: Application Report on Increasing Investment in ×× 110KV Power Transmission and Transformation Project ×× Power Company: Phase II Construction Renovation Project of ××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××× In: The government and the municipal planning and land administration required the 110KV incoming line of this station to enter into the substation with a 110KV cable from the north side of Beita Road and a length of about 580 meters. As a result, the investment in this station will increase by 2.84 million yuan (110KV) compared with the previous research report cable