一九七八年国家地震局科研处下达建设新丰江遥测台网的任务,并由581厂、中国科技大学和广东省地震局共同负责仪器研制及数据处理。并对台网设计提出了如下要求:(1)对库坝区地震,其震源误差的定位精度不超过0.5公里;(2)能利用遥测台网求得新丰江地震波速比必须达到的精度要求;(3)对Ms≥1级库坝区地震,台网所有子台都应能记录到,其布局应使得单个地震都能作出P波初动节面解。
In 1978, the research department of the State Seismological Bureau issued the task of building a Xinfengjiang telemetry network and was jointly responsible for instrument development and data processing by 581 Plant, China University of Science and Technology and Guangdong Seismological Bureau. The requirements of station network design are as follows: (1) The accuracy of the source error of the reservoir dam area is less than 0.5 km; (2) The accuracy of the Xinfengjiang seismic wave velocity ratio can be obtained by telemetry network Requirements; (3) For Ms≥1 earthquake in dam area, all sub-stations of the network should be able to record that the layout should be such that P-wave prime mover solution can be made by a single earthquake.