文章结合施工现场的特定条件,采取分区分层、循环推进的施工步骤,对承台制定不同的的浇注方案和技术措施,有效地降低了泵送大体积混凝土内部的最高温升,保证了混凝土施工质量。
Combined with the specific conditions of the construction site, the article adopts the construction steps of zoning by layer and circulation and promotion, and formulates different pouring schemes and technical measures for the caps to effectively reduce the maximum temperature rise inside the pumped mass concrete to ensure that the concrete Construction Quality.