论文部分内容阅读
风光旖旎的长白山脚下,第二松花江上游,一颗颗耀眼的明珠,在建设者们的精雕细琢地镶嵌在白山绿水之间,这就是松江河梯级水电站。松江河梯级水电站是松花江水系上继丰满、白山、红石之后又一座大型水电站,位于吉林省抚松县境内。1993年11月,经国家批准正式开工。1994年,列入吉林省“八五”十大重点工程之一。梯级电站由小山、双沟、石龙三座电站和松山、三道松江河两个引水工程共五部分组成。梯级建成后,五座坝蓄水成湖,似明珠一串。梯级电站原设计常规
The beautiful Changbai Mountain at the foot of the second upstream of the Songhua River, a dazzling pearl, built in the builders are crafted in the white mountains and lakes, this is the Songjiang River Cascade Hydropower Station. The Songjiang River Cascade Hydropower Station is a large hydropower station following the plummet of the Songhua River system, Baishan and Hongshi, and is located in Fusong County, Jilin Province. November 1993, officially approved by the state started. In 1994, it was listed in one of the ten major projects in the “Eighth Five-year Plan” period in Jilin Province. Cascade hydropower station by Hill, Shuanggou, Shilong three power plants and Songshan, three Songjiang River two diversion project consists of five parts. After the cascade was completed, five dams built into the lake, like a string of pearl. Cascade hydropower station original design routine