摘要:本文分析了10kV配网供电可靠性的故障停电和预安排停电的常见原因,并结合供电局实际可靠性情况分析,提出了影响供电可靠性的因素。针对这些因素和实际工作中存在的问题,提出了提高区域供电可靠性的具体技术和管理措施。把提高供电可靠性作为衡量服务质量、提升企业品牌形象的重要指标,从设备、人员、管理体系等多方面入手改善供电可靠性,加大配网建设投入,使城市配网逐步走向完善。
关键词:10kV配网供电; 可靠性; 技术措施
Abstract: this paper analyzes the 10 kV power supply reliability distribution network fault and the arrangement of the power of the common causes of power, and combined with actual situation reliability analysis of the power supply bureau, proposed the influence factors of the power supply reliability. According to these factors and the problems existing in the practical work, and puts forward the improving regional power supply reliability of specific technical and management measures. To improve the power supply reliability as a measure of service quality and promote the enterprise brand image of the important index, from equipment, personnel, the management system of ring-spuntechnique improve the power supply reliability, increase input in the construction of distribution network, urban distribution network to improve gradually.
Keywords: 10 kV power supply distribution network; Reliability; Technical measures
中圖分类号:TU71文献标识码:A 文章编号:
前言
电网安全性与经济性的矛盾日益突出随着我国经济发展和人民群众生活水平的提高以及近年来国外大停电事故的频发,社会各界对供电安全性的关注不断加大,对供电可靠性的要求越来越高, 电网运行安全性与经济性的矛盾日益突出。为满足电网可靠性的要求,部分地区不得不采取高低压电磁环网运行,造成高低压电网间存在环流,增加了电能损耗。
1. 10kV配网供电可靠率影响因素
1.1预安排停电
预安排停电是影响供电可靠率的原因之一。计划停电时的户数要占总停电时户数的60%,余下的40%则为故障停电所致。计划停电是影响供电可靠性的主要原因。预安排停电影响原因所占比例排序为:配网计划施工(56%)、用户工程( 25% )、配网计划检修(12% )、市政建设工程(7%)。
1.2故障停电
(1)外力破坏
这一部分包括不可抗力的灾害性气候破坏、另外也包括某些施工单位野蛮施工破坏和交通车辆破坏。
(2)设备原因
变压器的故障分为电路的故障和磁路的故障。电路的故障主要是线环和引线引起的故障等,一般有:线圈绝缘层的老化、空气潮湿、切换器的接触不良,使用的材料质量和材料制造工艺的不良,过电压冲击及二次系统短路引起的故障等。配电变压器常见故障主要有铁芯局部短路或烧毁,绝缘损坏;线圈间短路、断线,对地击穿;分接开关触头灼伤或有放电;套管对地击穿或放电。开闭所和配电室部分主要故障设施是电缆进、出线,大都发生在电缆中间接头及电缆端头短路等故障。电压互感器故障有铁磁谐振、受潮短路、绝缘劣化、局放或击穿。电流互感器故障有二次开路,如引线接头松、端子坏等;受潮绝缘下降而击穿;过热绝缘老化、腐蚀而造成电晕放电或局部放电。
1.3配电线路网架还不够灵活和完善,造成供电可靠性低
用户专变的维护检修不当影响 线路运行状况的稳定性。某些企业环境污染物较多且管理不善,造成电器设备的表面污物量大,不及时清理维护容易发生污闪事故,致使 10kV配电线路停电;同时污物可能造成电器设备的腐蚀损坏,造成停电事故。另外一些用电户不常生产,或为季节性生产,或开工不足,时停时开,变压器也时停时用。设备数量过多,造成供电可靠性较低。有些配电线路特别是涉及农村地区的线路带有好几十个用户的变压器,每次10kV配电线路停电就造成大量用电客户停电。同时一条线路上的各用电设备相互影响大,难以保障电能质量,由于不同的用电客户对电能质量的要求差别较大,对电能质量要求较高的用电客户就会反应强烈。
2. 供电可靠性分析
2.1 供电可靠性现状
2011年,龙华供电所辖区供电可靠率为99.9762%,用户平均停电时间达到2.09小时/户。故障停电共影响4706时户数,计划停电共影响3504时户数。可见龙华供电所辖区内主要停电影响为故障停电,占停电时户数的57.32%。
综合2011年的各类停电情况来看,龙华供电所供电可靠性逐年提高,但辖区内的配电网网架结构和运行管理方面还存在着一些不足之处,这些都制约着供电可靠率的进一步提高。
2.2 供电可靠性的原因存在的问题
(1)设备老化
因设备老化导致的故障合计69次,共影响3309时户数,占2011年龙华供电所故障停电时户数的70.31%。
(2)外力破坏
外力破坏也是10kV线路故障的主要原因。因外力因素导致的故障合计22次,共影响587时户数,占2011年龙华供电所占停电时户数的11.43%。其中,以外部施工影响和盗窃为主。
(3)施工安装原因
部分设备施工时的安装工艺不合格,导致运行一段时间后发生故障,其中,尤其以电缆头故障居多。施工安装工艺不良,导致线路重复停电,对供电可靠性指标的提高有一定的影响。
(4)用户设备
用户设备的选型对供电可靠性的影响也十分显著。2011年,龙华供电所因用户设备故障导致线路故障24次,共影响538时户数,占2011年龙华供电所故障停电时户数的12.47%。
大部分用户移交给供电局代管的设备均选用价格低廉的设备,例如环网柜选用XGN15-12。产品质量不高,运行一段时间后就会发生故障。
2.3改进建议
(1)加强带电作业管理,将带电作业工作范围、内容规范化,提高带电作业在配网检修、抢修、消缺、增容等工作中的应用程度。
(2)加强预安排停电的管理,统筹安排停电检修计划。加强上下级之间、部门之间的协调配合,加强停电申请管理“,先算后停”,严格控制停电“时户数”,以减少重复停电、低效率停电,实现供电可靠性指标的精细化控制。
(3)为了快速切除用户设备故障,建议加强对用户线路的技术管理。对新增高压用户装设分段器,对老用户提出治理整改措施的通知,并要求加装分段器,以提高配网切除故障用户的能力,减少对主线路的影响。
(4)加强故障频发线路的巡视,对薄弱点进行分析,完善事故处理预案,同时结合各种电网事故和异常情况,进行认真的分析研究,并做出详细的分析报告。
(5)针对部分老化设备,加强设备的运行巡视管理,采用红外测温等先进的技术手段,及早发现设备存在的隐患,平时积极申报改造项目,及时消除可能存在的缺陷。
3 提高供电可靠性的措施 .
针对上述存在的问题,要想供电可靠性持续稳步逐年上升。必须采取强有力的技术措施和管理措施。
3.1 技术措施
(1)做好电网规划。通过规划使配网形成电源布局合理,网络互供能力强,电能质量有保证的一个合理优化的网络。
(2)网改结束后,所有的变电站都必须满足“N-1”准则,1lOkV配电网宜采用多回路辐射或环网接线供电。
(3)对于新增电源和新架线路,全部采用可靠率高的新设备,采用负荷转移能力为100%的手拉手方式供电。如果配合实施配网自动化,实现故障线路自动判断、隔离,自动制定转带决策,将非故障段负荷转带,供电可靠性就有了保证。
(4)对老配电线路的改造,尤其是负荷集中、影响较大的重要旧线段,若不能进行大规模线路更新,应该采用双电源供电。
此改造方案对设备要求相对降低,综合投资不会增加太多,且在没有大规模停电的前提下进行施工,可避免可靠性的大幅度滑坡。
(5)为将lOkV配电网逐步改造为联络性强的环网结构,实现线路手拉手,必须增加线路分支开关及联络开关,将长线路分段,减少每段线路户数,缩小故障停电范围。
(6)在化工、污秽、树线矛盾突出及城市居民密集地区将架空线路改为绝缘导线;在繁华地段、重要地段、主要道路、高层建筑以及城市规划和市容景观有特殊要求的地段要采用电缆敷设;在居民小区和工矿企业使用箱式变。
(7)为了缩短架空线路发生故障后寻找故障区段的时间,宜在线路分段开关处和线路分支处装设机械架空线路故障指示器。在电缆的环网柜内宜装电缆故障传感器,故障信号经电缆将动作信号传到远方的监控系统,可判明故障发生的区段。
(8)加强事故抢修效率。与110联网成立报修中心,负责用户配网事故的调度,实行24h值班,配备较强的人力、物力,保证报修的及时性。
(9)推行状态检修。检修及维护部门根据设备实际状态进行针对性检修,提高检修质量,真正实现“应修必修,修必修好”,提高供电可靠性。
(10)加强带电作业的培训工作。已开展带电作业的单位要在原有基础上,以点带面,不断开发新项目。架空配电线路的建设与改造要从设计(横担长度、排列方式等)、施工(如杆上配电设备的安装)等方面为实施带电作业创造条件。
3.2 管理措施
(1)加强领导,提高认识。将可靠性列入日常的生产管理工作中,使生产管理以提高设备的可靠性水平和保证对用户可靠供电为主要目标,并将可靠性管理贯穿生产管理的全过程,使可靠性管理工作有保障。
(2)健全机构,完善规章制度。对供电所层面,成立以所长为组长,分管副所长工为副组长,相关部门主要领导组成的可靠性领导小组,实行由主管所长,配电部门,各单位可靠性专责组成的管理网络。完善各类规章制度,包括《可靠性管理办法》,《停电检修管理办法》,《考核细则》等,为提高供电可靠性做到有章可循。
(3)加強指标的管理工作,加强可靠性分析。对指标完成过程中发现的难点和疑点问题,及时制定相应对策,提出整改措施。
(4)加强计划停电管理,减少临时停电,杜绝重复停电。各部门的申请停电计划统一汇总,统筹安排,使变电、线路、施工及用户工作尽可能结合起来,实行“一停多用”。同时抓好停送电联系和倒闸操作的各个环节,在保证安全的基础上尽量缩短停电时间,做到三个“零时差”:运行部门停复电“零时差”(准时停电,准时复电),检修部门工作“零时差”(准时开工,准时竣工),实际停电与公告停电的“零时差”。遇到春检等大型停电更要精心安排,合理协调,将停电的时间和次数降低到最低限度。
(5)加强基础培训工作,提高可靠性管理水平,提高各级管理人员对可靠性概念的理解和认识,提高专责人的业务素质。
(6)考核管理要进一步完善。要将供电可靠性的考核纳入正规的企业承包考核之中,将可靠性完成指标的高低与全员工资直接挂钩,调动广大职工的积极性。
结语
提高配网供电可靠性,不仅是用户的需求,也是供电企业自身发展的需要。提高配电网供电可靠性,不但可以减少停电损失,避免因停电引起的经济纠纷,还可以树立良好的供电企业形象。提高10kV配电系统供电可靠性的途径和措施应主要是加强城网结构改造,采用高质量设备,缩短检修时间,提高检修质量,加强综合停电管理,尽可能采用带电作业,推广“状态检修”办法等。
关键词:10kV配网供电; 可靠性; 技术措施
Abstract: this paper analyzes the 10 kV power supply reliability distribution network fault and the arrangement of the power of the common causes of power, and combined with actual situation reliability analysis of the power supply bureau, proposed the influence factors of the power supply reliability. According to these factors and the problems existing in the practical work, and puts forward the improving regional power supply reliability of specific technical and management measures. To improve the power supply reliability as a measure of service quality and promote the enterprise brand image of the important index, from equipment, personnel, the management system of ring-spuntechnique improve the power supply reliability, increase input in the construction of distribution network, urban distribution network to improve gradually.
Keywords: 10 kV power supply distribution network; Reliability; Technical measures
中圖分类号:TU71文献标识码:A 文章编号:
前言
电网安全性与经济性的矛盾日益突出随着我国经济发展和人民群众生活水平的提高以及近年来国外大停电事故的频发,社会各界对供电安全性的关注不断加大,对供电可靠性的要求越来越高, 电网运行安全性与经济性的矛盾日益突出。为满足电网可靠性的要求,部分地区不得不采取高低压电磁环网运行,造成高低压电网间存在环流,增加了电能损耗。
1. 10kV配网供电可靠率影响因素
1.1预安排停电
预安排停电是影响供电可靠率的原因之一。计划停电时的户数要占总停电时户数的60%,余下的40%则为故障停电所致。计划停电是影响供电可靠性的主要原因。预安排停电影响原因所占比例排序为:配网计划施工(56%)、用户工程( 25% )、配网计划检修(12% )、市政建设工程(7%)。
1.2故障停电
(1)外力破坏
这一部分包括不可抗力的灾害性气候破坏、另外也包括某些施工单位野蛮施工破坏和交通车辆破坏。
(2)设备原因
变压器的故障分为电路的故障和磁路的故障。电路的故障主要是线环和引线引起的故障等,一般有:线圈绝缘层的老化、空气潮湿、切换器的接触不良,使用的材料质量和材料制造工艺的不良,过电压冲击及二次系统短路引起的故障等。配电变压器常见故障主要有铁芯局部短路或烧毁,绝缘损坏;线圈间短路、断线,对地击穿;分接开关触头灼伤或有放电;套管对地击穿或放电。开闭所和配电室部分主要故障设施是电缆进、出线,大都发生在电缆中间接头及电缆端头短路等故障。电压互感器故障有铁磁谐振、受潮短路、绝缘劣化、局放或击穿。电流互感器故障有二次开路,如引线接头松、端子坏等;受潮绝缘下降而击穿;过热绝缘老化、腐蚀而造成电晕放电或局部放电。
1.3配电线路网架还不够灵活和完善,造成供电可靠性低
用户专变的维护检修不当影响 线路运行状况的稳定性。某些企业环境污染物较多且管理不善,造成电器设备的表面污物量大,不及时清理维护容易发生污闪事故,致使 10kV配电线路停电;同时污物可能造成电器设备的腐蚀损坏,造成停电事故。另外一些用电户不常生产,或为季节性生产,或开工不足,时停时开,变压器也时停时用。设备数量过多,造成供电可靠性较低。有些配电线路特别是涉及农村地区的线路带有好几十个用户的变压器,每次10kV配电线路停电就造成大量用电客户停电。同时一条线路上的各用电设备相互影响大,难以保障电能质量,由于不同的用电客户对电能质量的要求差别较大,对电能质量要求较高的用电客户就会反应强烈。
2. 供电可靠性分析
2.1 供电可靠性现状
2011年,龙华供电所辖区供电可靠率为99.9762%,用户平均停电时间达到2.09小时/户。故障停电共影响4706时户数,计划停电共影响3504时户数。可见龙华供电所辖区内主要停电影响为故障停电,占停电时户数的57.32%。
综合2011年的各类停电情况来看,龙华供电所供电可靠性逐年提高,但辖区内的配电网网架结构和运行管理方面还存在着一些不足之处,这些都制约着供电可靠率的进一步提高。
2.2 供电可靠性的原因存在的问题
(1)设备老化
因设备老化导致的故障合计69次,共影响3309时户数,占2011年龙华供电所故障停电时户数的70.31%。
(2)外力破坏
外力破坏也是10kV线路故障的主要原因。因外力因素导致的故障合计22次,共影响587时户数,占2011年龙华供电所占停电时户数的11.43%。其中,以外部施工影响和盗窃为主。
(3)施工安装原因
部分设备施工时的安装工艺不合格,导致运行一段时间后发生故障,其中,尤其以电缆头故障居多。施工安装工艺不良,导致线路重复停电,对供电可靠性指标的提高有一定的影响。
(4)用户设备
用户设备的选型对供电可靠性的影响也十分显著。2011年,龙华供电所因用户设备故障导致线路故障24次,共影响538时户数,占2011年龙华供电所故障停电时户数的12.47%。
大部分用户移交给供电局代管的设备均选用价格低廉的设备,例如环网柜选用XGN15-12。产品质量不高,运行一段时间后就会发生故障。
2.3改进建议
(1)加强带电作业管理,将带电作业工作范围、内容规范化,提高带电作业在配网检修、抢修、消缺、增容等工作中的应用程度。
(2)加强预安排停电的管理,统筹安排停电检修计划。加强上下级之间、部门之间的协调配合,加强停电申请管理“,先算后停”,严格控制停电“时户数”,以减少重复停电、低效率停电,实现供电可靠性指标的精细化控制。
(3)为了快速切除用户设备故障,建议加强对用户线路的技术管理。对新增高压用户装设分段器,对老用户提出治理整改措施的通知,并要求加装分段器,以提高配网切除故障用户的能力,减少对主线路的影响。
(4)加强故障频发线路的巡视,对薄弱点进行分析,完善事故处理预案,同时结合各种电网事故和异常情况,进行认真的分析研究,并做出详细的分析报告。
(5)针对部分老化设备,加强设备的运行巡视管理,采用红外测温等先进的技术手段,及早发现设备存在的隐患,平时积极申报改造项目,及时消除可能存在的缺陷。
3 提高供电可靠性的措施 .
针对上述存在的问题,要想供电可靠性持续稳步逐年上升。必须采取强有力的技术措施和管理措施。
3.1 技术措施
(1)做好电网规划。通过规划使配网形成电源布局合理,网络互供能力强,电能质量有保证的一个合理优化的网络。
(2)网改结束后,所有的变电站都必须满足“N-1”准则,1lOkV配电网宜采用多回路辐射或环网接线供电。
(3)对于新增电源和新架线路,全部采用可靠率高的新设备,采用负荷转移能力为100%的手拉手方式供电。如果配合实施配网自动化,实现故障线路自动判断、隔离,自动制定转带决策,将非故障段负荷转带,供电可靠性就有了保证。
(4)对老配电线路的改造,尤其是负荷集中、影响较大的重要旧线段,若不能进行大规模线路更新,应该采用双电源供电。
此改造方案对设备要求相对降低,综合投资不会增加太多,且在没有大规模停电的前提下进行施工,可避免可靠性的大幅度滑坡。
(5)为将lOkV配电网逐步改造为联络性强的环网结构,实现线路手拉手,必须增加线路分支开关及联络开关,将长线路分段,减少每段线路户数,缩小故障停电范围。
(6)在化工、污秽、树线矛盾突出及城市居民密集地区将架空线路改为绝缘导线;在繁华地段、重要地段、主要道路、高层建筑以及城市规划和市容景观有特殊要求的地段要采用电缆敷设;在居民小区和工矿企业使用箱式变。
(7)为了缩短架空线路发生故障后寻找故障区段的时间,宜在线路分段开关处和线路分支处装设机械架空线路故障指示器。在电缆的环网柜内宜装电缆故障传感器,故障信号经电缆将动作信号传到远方的监控系统,可判明故障发生的区段。
(8)加强事故抢修效率。与110联网成立报修中心,负责用户配网事故的调度,实行24h值班,配备较强的人力、物力,保证报修的及时性。
(9)推行状态检修。检修及维护部门根据设备实际状态进行针对性检修,提高检修质量,真正实现“应修必修,修必修好”,提高供电可靠性。
(10)加强带电作业的培训工作。已开展带电作业的单位要在原有基础上,以点带面,不断开发新项目。架空配电线路的建设与改造要从设计(横担长度、排列方式等)、施工(如杆上配电设备的安装)等方面为实施带电作业创造条件。
3.2 管理措施
(1)加强领导,提高认识。将可靠性列入日常的生产管理工作中,使生产管理以提高设备的可靠性水平和保证对用户可靠供电为主要目标,并将可靠性管理贯穿生产管理的全过程,使可靠性管理工作有保障。
(2)健全机构,完善规章制度。对供电所层面,成立以所长为组长,分管副所长工为副组长,相关部门主要领导组成的可靠性领导小组,实行由主管所长,配电部门,各单位可靠性专责组成的管理网络。完善各类规章制度,包括《可靠性管理办法》,《停电检修管理办法》,《考核细则》等,为提高供电可靠性做到有章可循。
(3)加強指标的管理工作,加强可靠性分析。对指标完成过程中发现的难点和疑点问题,及时制定相应对策,提出整改措施。
(4)加强计划停电管理,减少临时停电,杜绝重复停电。各部门的申请停电计划统一汇总,统筹安排,使变电、线路、施工及用户工作尽可能结合起来,实行“一停多用”。同时抓好停送电联系和倒闸操作的各个环节,在保证安全的基础上尽量缩短停电时间,做到三个“零时差”:运行部门停复电“零时差”(准时停电,准时复电),检修部门工作“零时差”(准时开工,准时竣工),实际停电与公告停电的“零时差”。遇到春检等大型停电更要精心安排,合理协调,将停电的时间和次数降低到最低限度。
(5)加强基础培训工作,提高可靠性管理水平,提高各级管理人员对可靠性概念的理解和认识,提高专责人的业务素质。
(6)考核管理要进一步完善。要将供电可靠性的考核纳入正规的企业承包考核之中,将可靠性完成指标的高低与全员工资直接挂钩,调动广大职工的积极性。
结语
提高配网供电可靠性,不仅是用户的需求,也是供电企业自身发展的需要。提高配电网供电可靠性,不但可以减少停电损失,避免因停电引起的经济纠纷,还可以树立良好的供电企业形象。提高10kV配电系统供电可靠性的途径和措施应主要是加强城网结构改造,采用高质量设备,缩短检修时间,提高检修质量,加强综合停电管理,尽可能采用带电作业,推广“状态检修”办法等。