论文部分内容阅读
为为印刷界瞩目的国家“双加工程”项目之一的中国乐凯胶片集团第二胶片厂高技术、高车速 PS 版生产线经过两年多时间的建设,近日在河南南阳建成投产。中国印刷及设备器材工业协会会长李守仁、河南省石化厅厅长何祥及有关部门领导和印刷界、新闻界、外国专家、印刷材料销售商等300多名代表到该厂表示祝贺。二胶双高 PS 版生产线是引进美国宝丽光公司技术,关键设备由德国、英国和美国制造,辅助设备由国内配套的高技术、高车速生产线,总投资1.579亿元人民币,设计车速25米/分,年生产能力达800万平方米;生产线采用先进的版材在线自动检测、槽液在线检测和自动补加、铝板输出、数字式控制拖动系统等新技术。1997年2月15日,该生产线开工建设。经过两年时间的土建、设备安装
The high-tech, high-velocity PS production line of the second film factory of China Lucky Film Group, one of the country’s “double-plus-projects” projects highlighted by the printing industry, has been completed and put into production in Nanyang, Henan province, after more than two years of construction. Li Shengren, president of the China Printing and Equipment Industry Association, He Xiang, head of the Henan Provincial Petrochemical Department, and leaders of related departments, and more than 300 representatives from the printing industry, the press, foreign experts, and printing materials vendors, congratulated the factory. The two-high PS version of the production line is the introduction of American Polaroid technology, key equipment manufactured by Germany, the United Kingdom and the United States, supporting equipment from domestic high-tech, high-speed production line, a total investment of 157.9 million yuan, the design speed of 25 meters With an annual production capacity of 8 million square meters, the production line adopts advanced technologies such as online automatic detection of plate materials, on-line detection and automatic addition of bath fluid, aluminum plate output, and digital control and drag system. On February 15, 1997, the production line started construction. After two years of civil construction and equipment installation