首先对三峡左岸电站计算机监控系统的系统结构、设备配置及网络结构等方面作了总体介绍,系统设计是基于ADVANTOCS(OpenControlSystem)技术,ADVANTOCS是一种开放、分布式的综合自动化过程控制系统;随后介绍了网关工作站的功能和配置,中国水利水电科学研究院自动化所参加了系统网关工作站的联合开发。本文最后对网关工作站IEC60870-6-TASE.2和IEC60870-5-101通信规约的实现部分也作了相应的介绍。
First of all, it introduces the system structure, equipment configuration and network structure of the computer monitoring system of the Three Gorges Left Bank Power Station. The system design is based on ADVANTOCS (OpenControlSystem) technology. ADVANTOCS is an open and distributed integrated process control system. Introduced the function and configuration of the gateway workstations, and the automation of China Academy of Water Resources and Hydropower participated in the joint development of the system gateway workstations. At the end of this paper, the gateway workstations IEC60870-6-TASE.2 and IEC60870-5-101 communication protocol implementation part also made a corresponding introduction.