许多城市的主干道路需要进行道路改造或建设高架桥,施工期间将给本来就难于负重的城市交通雪上加霜。针对该问题,本文以厦门市快速公交系统(BRT)一号线高架桥施工期间的交通组织为例,系统研究高架桥施工期间的交通组织,重点分析了在施工期间如何进行交通分流、管制,合理布置交通安全设施以及如何科学安排工期工序,以使得施工期间对周边道路交通的影响降至最低。
Many of the city’s trunk roads need to be rebuilt or viaducts constructed and will have to deal with urban traffic that would otherwise have been difficult to carry. In view of this problem, this paper takes the traffic organization during the viaduct construction of Xiamen BRT (BRT) Line No.1 as an example to systematically study the traffic organization during the viaduct construction period, and analyzes how to divert, control and arrange the traffic during the construction period Traffic safety facilities and how to scientifically schedule the construction period so as to minimize the impact on surrounding road traffic during the construction period.