为确定普拉塞尔多姆公司迪图尔湖矿矿石水力提升系统的可行性,计算了其在该矿条件下的最佳运行状况,通过经济分析估算了水力提升吨矿成本,并与新竖井提升成本进行了比较。研究表明迪图尔湖矿采用矿石水力提升装置提升成本较低,是可行的。采用的研究方法非常有效,可供类似的矿山采用。
In order to determine the feasibility of the hydraulic lift system for the Mineral Lake in Lake Seldormur, the best operating conditions for this mine are calculated and the cost of hydraulically boosting the tonnage is estimated through economic analysis, Shaft lifting costs were compared. Research shows that it is feasible to adopt the hydraulic lifting device for ore in the Lake Titur Lake to raise the cost. The methodology used is very effective and can be used by similar mines.