论文部分内容阅读
第一次由国内独立承包的超高层建筑钢结构工程——北京京城大厦钢结构工程,有关钢构件已于1988年12月29日在上海沪东造船厂全面完工,质量达到设计要求。这表明,我国已经具备了超高层建筑钢结构件的制造能力,填补了我国在这一领域中的空白。京城大厦是由中国国际信托投资公司投资、上海第九设计院承担主体钢结构施工图设计、沪东造船厂负责钢结构件制造的一幢多功能的超高层钢结构大厦。京城大厦钢结构件加工量达18000余吨,这相当于2艘半42000吨级船舶的钢材加工量。目前,上海国际贸易大厦、上海展
The first high-rise building steel structure project contracted by China independently—the steel structure project of Beijing Jingcheng Building. The relevant steel components were fully completed at Shanghai Hudong Shipyard on December 29, 1988, and the quality reached the design requirements. This shows that China has already possessed the manufacturing capabilities of steel structures for super high-rise buildings, filling in the gaps in this field in China. Jingcheng Mansion is a multi-functional super high-rise steel structure building invested by China International Trust and Investment Corporation, the Shanghai Ninth Design Institute as the main steel structure construction drawing design, and Hudong Shipyard responsible for the manufacture of steel structural parts. The processing capacity of steel structure parts in the Beijing Capital Building amounts to more than 18,000 tons, which is equivalent to the processing volume of steel for two and a half 42,000-ton ships. Currently, Shanghai International Trade Building, Shanghai Exhibition