论文部分内容阅读
1990年是第七个五年计划的最后一年,也是改革开放以来的第十个年头。十年来,探矿工程工作在各个方面都有了长足的进步,取得了显著的成绩,在为地质找矿和为国民经济建设众多领域的服务中做出了很大贡献。为了在新形势下跟上时代的步伐,有必要对“六五”和“七五”的工作认真、系统和全面地加以回顾和总结,在肯定成绩的基础上找出差距和不足之处,针对存在问题,制订新的对策,以利今后再战。“八五”和本世纪末以前,探矿工程工作要在治理整顿和深化改革的方针指引下,为实现国民经济持续、稳定和协调发展做出应有的新贡献。“六五”、“七五”期间至少有下列几点经验应予肯定
1990 is the last year of the Seventh Five-Year Plan and the tenth year since the reform and opening up. Over the past ten years, the work of prospecting has made great strides in all aspects and remarkable achievements have been made. It has made great contributions to the prospecting for geology and the service for many fields of national economy construction. In order to keep up with the pace of the times in the new situation, it is necessary to review and summarize the work in the 6th Five-Year Plan and the Seventh Five-Year Plan in a serious, systematic and comprehensive manner, identify gaps and deficiencies on the basis of affirmative achievements, In response to the existing problems, formulate new measures to facilitate future battles. Before the “8th Five-Year Plan” and the end of this century, under the guidance of the principle of rectifying and deepening reform, the work of prospecting engineering should make due contributions to the realization of the sustained, stable and coordinated development of the national economy. At least the following experiences during the “June 5” and “July 5” plans should be affirmed