矿山建设是一项规模大、工程多、技术复杂、工期较长的综合性工程,井巷、土建、机电安装三大工程交叉配合,分工精细,各工序、工种之间关系密切,如不有机地统筹安排,势必产生窝工浪费,互不协调,甚至中途停工等现象,从而延误矿山建设期限。为了合理安排施工进度,相互协调,有节奏地紧密配合,充分利用时间和空间,创造平面与立体、多工种与多工序交叉作业,以加快工程施工进度,缩短建设工期,我们在南洺河铁矿建设施工总排队设计中应用了统筹法。
Mine construction is a large-scale, multi-project, complex technology, longer duration of a comprehensive project, well, civil engineering, electrical and mechanical installation of the three major cross-linked projects, the division of labor is fine, the various processes, To co-ordinate arrangements will inevitably lead to wastage, incompatibility and even suspension of work phenomena, thus delaying the construction period of mines. In order to reasonably arrange the progress of construction, mutual coordination, rhythm and close coordination, make full use of time and space, to create a plane and three-dimensional, multi-species and multi-process cross-operation to speed up the construction progress and shorten the construction period, The overall queuing method has been applied in the design of the total queue of mine construction and construction.