马丁·马尔塔公司目前正在履行在新奥尔良州航宇局米楚德装配厂设计和制造航天飞机外贮箱的合同。最初合同要求在米楚德装配厂制造3个地面试验产品和6个飞行产品以及设计和制造装配用的工装。这项工作是由亚拉巴马州航宇局马歇尔空间飞行中心根据NAS8-30300合同提出来的。题为“航天飞机外贮箱制造用硬工装”的前一篇文章发表于1977年12月焊接杂志上。
Martin Martha is currently in the process of contracting for the design and manufacture of shuttle outer tanks at the Midu, New Orleans State Space Administration’s Midoch Assembly Plant. The original contract required the manufacture of three ground-based test products and six flight products and the design and manufacture of tooling for the assembly at the Mitutoyo assembly plant. This work was submitted by NASA Marshall Space Flight Center in Alabama under the NAS8-30300 contract. The previous article, entitled “Hard Workwear for the Space Shuttle Storage Tanks,” was published in the December 1977 issue of Welding.