施工需要编制施工方案。在金山二期工程芳烃联合装置的施工中,工作的实物量很大,仅总体电气电缆就有200多公里,总体仪表电缆250多公里。现场施工管理人员要熟悉大量的图纸、资料,弄清设计意图、设计要求和设计目的,还要编制施工预算,并在施工之前写出单位工程的施工方案。为了减轻施工人员的工作负担,我们根据长期实践的经验,针对金山工程中大量的重复出现
Construction needs preparation of construction plans. Jinshan Phase II project in the construction of aromatic compounds, a large amount of work, only the overall electrical cable has more than 200 kilometers, the total instrument cable more than 250 kilometers. Site construction managers should be familiar with a large number of drawings and information to understand the design intent, design requirements and design purposes, but also the preparation of the construction budget, and write down the construction of unit projects before the construction program. In order to reduce the workload of construction workers, we based on the experience of long-term practice, a large number of repeated Jinshan works