论文部分内容阅读
1 2001年专委会的工作总结(1)配合行业主管部门完善适应社会主义市场经济体制的水电工程造价制度,参与改革、推进改革。2002年,工程造价处相继对“水电工程设计概算编制办法及计算标准”、“水电工程实物量分析法典型算例”进行了研究探讨,专委会委员,积极主动参与调研及编写工作,并围绕中心召开多次研讨会
1 Summary of the Work of the Special Commission in 2001 (1) Cooperate with competent departments of industry to perfect the hydropower project cost system that is adapted to the socialist market economy system, take part in the reform and promote the reform. In 2002, the Project Cost Division successively conducted research and discussion on the Compilation Methods and Computation Standards for Hydropower Engineering Design Estimates, the Typical Examples for Physical Quantity Analysis Method for Hydropower Projects, and the committee members actively participated in the investigation and research. Preparation work, and held several seminars around the center