本文简要叙述了鄂钢3#高炉(380M3)经过18天的中修后,通过工艺设备改进和操作技术的提高,顺利开炉并迅速达产的过程,主要技术经济指标取得了较大改善。
This paper briefly describes the process of improving the operation of the 3 # blast furnace (380M3) of Hubei Iron & Steel Co., Ltd. (380M3) after 18 days of medium repair. The main technical and economic indexes have been greatly improved.