论文部分内容阅读
铁道部通信重点工程——西南铁路与地方首次合资建设的成都至重庆540 km的光缆工程,于1998年2月24日前,由成都铁路局组织,在成铁分局、成都、内江、重庆电务段的配合下,经中央广播电视部、中国联通公司、四川省广播电视厅、铁道部第二勘测设计院等单位初验,施工质量基本达到规定标准,初步具备国家复验条件。预计4月底全线开通。该工程由铁路部门与广电部、联通公司3家投资。工程由铁道部第二勘测设计院设计,济南铁路局通号总公司、铁二局电务处等5家单
Railway key project of Ministry of Railways communications - Southwest Railway and local first joint construction of 540 km of Chengdu to Chongqing optical cable project, in February 24, 1998, organized by the Chengdu Railway Bureau, Chengdu Branch, Chengdu, Neijiang, Chongqing Electric Power With the cooperation of the Central Radio and Television, China Unicom, Sichuan Radio and Television, the Ministry of Railways Survey and Design Institute of the second unit and other preliminary test, the construction quality basically meet the required standards, preliminary with the national re-inspection conditions. The entire line is expected to be opened by the end of April. The project by the railway sector and the Ministry of Radio, China Unicom 3 investment. The project was designed by the Ministry of Railways Survey and Design Institute No. 2, Ji’nan Railway Bureau pass number head office, iron two Bureau Service Department and other five single