3月5日前恢复220千伏和110千伏电网,基本满足全省生产、生活用电。4月20日前恢复贵州500千伏电网的联网运行和西电东送部分通道,全面恢复全省生产、生活用电和满足西电东送计划需要。5月20日前全面恢复500千伏电网和西电东送通道的安全运行。
March 5 to restore 220 kV and 110 kV power grid, basically meet the province’s production and living electricity. April 20 to restore grid-connected operation of Guizhou 500-kilovolt power grid and some power transmission channels to fully restore the province’s production and living electricity and to meet the needs of the West to East transmission plan. May 20 full recovery of 500 kV power grid and the safe operation of the West to East channel.