论文部分内容阅读
通过对困难山区既有电气化株六铁路增建第二线选线设计的实践,介绍优化设计方案、减小对既有线运营干扰以及控制工程投资等的体会。
Through the practice of designing the second-line route selection for the existing electrified railway Liuzhou in the difficult mountain area, the author introduced the optimization design scheme, reduced the interference to the existing line operation and controlled the project investment.