铁道部电务局,为了介決鋼筋混凝土信号机柱裂缝問題,于八月间组成了专門調查小组,由铁路专业設計院、电务设计事务所、丰台桥梁工厂等单位参加。先后到电务局工程总队、郑州局、西安局、兰州局等所属的有关車站,作了广泛的調查了解。根据調查小组的报告,铁道部电务局己向全路公布了“水泥信号机柱裂纹暂行处理办法及运輸处理办法”。我院依照部局的指示,将原設計图紙(房861)保留。
In order to solve the problem of cracks in the reinforced concrete signal column, the Electric Power Bureau of the Ministry of Railways formed a special investigation team in August and was attended by units including Railway Professional Design Institute, Power Design Office and Fengtai Bridge Factory. Successively to the Bureau of Engineering, Zhengzhou Bureau, Xi’an Bureau, Lanzhou Bureau and other affiliated stations, made extensive investigations and understandings. According to the report of the investigation team, the electric power bureau of the Ministry of Railways has promulgated to the whole road the Interim Measures for Handling Cracks of Cement Signals and Their Handling Measures. Our hospital in accordance with the instructions of the ministry, the original design drawings (room 861) retained.