论文部分内容阅读
水利工程项目划分是水利工程质量评定的基础,由于水利工程施工涉及的技术标准规定的程序和内容不一致,造成了质量评定工作的混乱,使一些质量评定结果不能真实反映工程的实际情况。文章根据工程实际情况,结合现有的水利工程技术标准,提出项目划分分阶段进行的概念,从而使划分的内容更加贴近工程实际,对施工质量控制及管理起到积极的促进作用。
The division of water conservancy projects is the basis for the quality assessment of water conservancy projects. Due to inconsistent procedures and contents stipulated in the technical standards for water conservancy construction, the quality assessment work is confused, so that some quality assessment results can not truly reflect the actual conditions of the project. According to the actual situation of the project and the existing technical standards of hydraulic engineering, the article puts forward the concept of phased project division so as to make the content of the project closer to the actual project and play an active role in the construction quality control and management.