抽水蓄能电站在电网安全稳定运行中,主要承担电网调峰填谷、调频、调相以及事故备用任务,机组的安全可靠对区域电网有效的电力调节控制具有重要作用。按照新机并网有关要求,机组投运前需进行相应的安全性评价试验,以考验机组的各项性能指标满足电网要求,安全性评价试验一方面是验证机组特性是否满足电网安全稳定运行的条件,同时也是第三方协助业主对机组各项技术指标和参数的评价。因此安评试验对电站机组转入投产具有重要意义。
In the safe and stable operation of the power grid, the pumped storage power station mainly undertakes peak load shifting, frequency modulation, phase modulation and accident backup tasks of the power grid. The safety and reliability of the generating set plays an important role in the effective power regulation control of the regional power grid. According to the requirements of the new machine and the grid, the unit should be put into operation before the corresponding safety evaluation test to test the performance of the unit to meet the power grid requirements, safety evaluation test on the one hand is to verify the characteristics of the unit to meet the safety and stability of power grid operation Conditions, but also a third party to assist owners of the unit of the technical indicators and parameters of evaluation. Therefore, safety assessment test on the power plant unit put into operation is of great significance.