加强承揽工程项目管理机制的几点设想

来源 :水利水电工程造价 | 被引量 : 0次 | 上传用户:jianjian19527
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
搞好承揽工程项目是企业经济效益的支柱,如何使这一支柱稳固并使其支撑力不断增强,关键靠以人为本的管理,同时与项目的管理机制也不无关系,因此要做好以下几项工作:建立完善竞争机制,选好项目经理及班子;完善项目经理激励机制,激发和调动其积极性;加强对工程项目的指导,保证项目有序地进行;完善财务监督体系,确保项目财务目标的实现;搞好承揽项目,更应完善项目内部管理机制。 To do a good job in contracting engineering projects is the pillar of the economic benefits of enterprises. How to make this pillar steady and supportive is the key to people-oriented management, and it is not unrelated to the project management mechanism. Therefore, the following items Work: Establish and perfect the competition mechanism, select the project manager and team; Improve the incentive mechanism of project manager to stimulate and mobilize their enthusiasm; Strengthen the guidance of the project to ensure the project in an orderly manner; Improve the financial supervision system to ensure the financial objectives of the project Achieve; do a good job contracting projects, but also improve the project’s internal management mechanism.
其他文献
本文选择“中国最美的乡村”婺源风景区作为描述背景,通过阐述“婺源”旅游景区这个典型的正处于发展中的乡村旅游景区体验式产品的匮乏,来论述体验式婺源乡村旅游景区打造的
设计变更是水利水电工程建设实施阶段的重要组成部分,其管理工作仍处在一个逐步探索和发展的阶段。结合积石峡水电站工作实际,在阐述工程项目设计变更主要原因的基础上,给出
“双抢”期间,绵竹市什地镇各级干部把办公室搬到农户家中,搬到田间地头,切实解决好群众最急、最怨、最缺、最盼的问题,做到“双抢”与防非典两不误。图为和平村的村干部正
期刊
有读者来信询问:我们这里有的村党支部召集党员开会时都要付给报酬,请问,这样做合理吗?本刊经向有关方面咨询,现答复如下——党员参加党组织召集的有关会议,是党员的权利和
刺槐(Robina Pseudocaia)人工林,60年代以后在辽西得到迅速发展。仅朝阳地区至1983年保存面积为1293.1km~2。但由于忽视了对立地质量的评价,缺乏对适地适树的研究,片面地追
省林产工业技术发展政策的研究在我省还是第一次提出的。制定正确的林产工业技术发展政策来引导林产工业的发展,已成为各级领导普遍关心和重视的课题;加速技术进步成为振兴
什么是代码?代码又可简称为码,就是用以表示某一或某些事物的符号。代码实际上就是符号,任何代码都能满足符号过程的三个因素.因为信息交流要经过编码和解码,所以我们把这类
已有研究表明乙酰胆碱酯酶抑制剂多奈哌齐和加兰他敏具有减轻氧糖剥夺导致的神经元损伤并减小脑缺血动物的脑梗死体积的作用,但它们的这种作用可能并不完全依赖于其胆碱酯酶
一、系统辨识和因果关系图森林是最大、最复杂的陆地生物生态系统,在其内部有着自身的能量转化、物质循环规律。它是人类赖以生存的重要的自然资源。四川是一个少林省份,“
问:春季造林为啥要强调“宜早不宜迟”?答:因为春季早栽的苗木先生根后发芽,苗木水分蒸发量小,容易成活。因此北方地区提倡“顶凌造林”(也叫“顶浆造林”),即在土壤化冻到