论文部分内容阅读
本文介绍了高速铁路无绝缘轨道电路试验及调试的步骤和方法:调试前的准备工作、现场调试和联锁试验,以期对类似工作提供借鉴。
This paper introduces the steps and methods of testing and debugging the high-speed railway uninsulated track circuit: preparation before commissioning, on-site commissioning and interlocking test so as to provide reference for similar work.