摘要:工程造价一般是指进行某项工程建设所花费的全部费用。因而,对其管理是多方面的,包括建设单位、设计单位、施工单位、有关职能部门等。建筑施工企业面临着激烈的市场竞争,为了在市场竞争中增加效益,提高企业竞争力,必须加强施工过程中的成本控制,施工阶段项目成本控制贯穿于整个施工过程。在分析项目成本控制存在的问题及原因的基础上,提出加强建筑施工企业施工阶段成本控制的对策。
关键词:建设单位,工程造价,造价管理
Abstract: the engineering cost is usually referred to as a project construction cost for all expenses incurred. Therefore, the administration is in many aspects, including the construction unit, the design, the construction unit, the unit of departments, etc. Construction enterprises are faced with fierce competition in the market, in order to in market competition to increase benefits, enhance the competitiveness of enterprises, must strengthen the construction process of cost control, construction stage project cost control through the whole construction process. On the analysis of the project cost control are based on the problems and reasons, strengthening the construction enterprise construction stage of cost control countermeasures.
Key words: the construction unit, the construction cost, cost management
中图分类号:TU723.3文献标识码:A 文章编号:
引言
项目是施工企业的成本中心,也是利润的主要来源。随着行业竞争日趋激烈,获利空间越来越小,施工企业都更加重视工程项目的工程造价及成本管理,把成本控制目标作为重要的考核指标。因此建设单位的工程造价的管理水平对控制投资起着至关重要的影响。建设单位对工程造价的管理要贯穿于工程建设的全过程,即包括建设工程的立项决策阶段、设计阶段、招投标阶段、施工阶段、竣工结算阶段,下面针对上述五个阶段分别进行论述:
1决策阶段工程造价的管理
在这一阶段对工程造价的管理重点是积极参与项目决策前的准备工作,认真搜集有关资料,如设备运行情况、设备技术参数、需要解决的问题、工程实施后的效益分析、编制工程投资估算等。一方面力求编写的立项申请具有较强的说服性和可行性,争取早日立项。另一方面力求编制的投资估算尽可能全面,充分考虑到施工过程中可能出现的各种情况及不利因素对工程造价的影响,使投资估算真正起到控制项目总投资的作用。可见,项目决策阶段的工程造价管理并不仅仅是职能部门的事,作为建设单位应积极参与工程造价管理,充分发挥自身的作用。
项目经理部首先以中标“标书”为依据确定项目的目标成本。根据设计图纸和有关技术资料,对项目的特点和实施方法等进行认真的研究分析,并运用价值工程原理,制定出科学先进、经济合理的施工方案。其次根据目标成本,以分部分项目工程实物工程量为基础,编制具体的分步实施的项目成本计划,为今后的成本控制作好准备。最后编制现场经费预算,进行分解后以责任成本的形式落实下去,为今后的成本控制和绩效考评提供依据。
2设计阶段工程造价的管理
初步设计是设计过程中的一个关键性阶段,也是整个设计构思基本形成阶段。从现行的基本建设程序上讲,可行性研究后,提出项目建议,审批后,建设方委托有相应资格的设计单位进行初步设计,设计单位根据项目的功能及其要求,来初步确定项目的总图规划、单体以及相关的配套规划,以达到项目的功能。在这样的初步设计中,多数是由规划师、建筑师及相关专业的工程师来完成,而造价工程师很少介入,由于实施的人不具备造价专业知识,对影响工程造价方面的因素考虑自然不全面,往往容易造成一些不必要的浪费。如由于地质条件的差异、由于结构选型的差异、场内土石方平衡的差异等造成的工程造价不必要的增加和浪费。
3项目招标过程中的造价管理
工程招标投标包括设备、材料采购招投标和施工招投标两个方面,通过招投标建设单位选择施工单位和材料供应商,这对项目投资乃至质量、进度的控制都有至关重要的作用。笔者认为,在招标过程中成本控制,建设单位应注意与加强以下几点:
(1)招标工作应遵循公平、公开、公正、诚信的原则。招标前,应严格审查施工单位和材料供应商的资质,必要时进行实地考察,避免“特级企业投标,一级企业转包,二级企业进场”等不正常现象,这对项目成本控制非常不利。
(2)做好招标文件的编制工作,造价管理人员应收集、积累、筛选、分析和总结各类有价值的数据、资料,对影响工程造价的各种因素进行鉴别、预测、分析、评价,然后编制招标文件。对招标文件中涉及费用的条款要反复推敲,尽量做到“知己知彼”,以利于日后的造价控制。
(3)合理低价者中标。目前推行的工程量清单计价报价与合理低价中标,作为建设单位应杜绝一味寻求绝对低价中标,以避免投标单位以低于成本价恶意竞争。所谓合理低价,是在保证质量、工期前提下的合理低价。
4实施阶段工程造价的管理
4.1制定合理工期是控制施工项目成本的关键
施工工期是一种有限的时间资源,在项目管理中有特定的价值,即“工期价值”。对工程项目而言,工程的质量、成本和工期是施工管理的三大主线,工期是否合理直接影响着施工质量和成本,因此,施工项目管理中的时间管理非常重要。
当施工工期变化时,会引起工程劳动量(人工与机械)的变化。市场中的物价是波动的,材料价格会随工期的长短而不同。因此,同一工程项目,工期不同,工程成本就不同。因此,合理的施工进度安排,能最大限度地缩短工期,将减少工程费用,使施工单位获得较好的经济效益。
4.2工程材料价格管理
工程材料价格管理是工程造價管理的重点,也是难点。“市场形成价格”这一理论要求我们正确对待价格信息。为了控制工程造价,应主动去了解市场,控制工程造价,走向市场,了解比较多家材料供应商的产品质量和价格,筛选出几家质优、价廉的材料、设备供应商,并与这些供应商建立长期的联系,及时了解材料、设备的价格变化情况,同时,适时掌握周边商家的材料、设备价格情况。认真研究拟采购的材料、设备的技术问题,认真推敲合同的技术条款从而能较好的控制材料、设备的质量和价格,杜绝因设备采用、安装问题对今后造成不良影响,合理控制工程造价。
4.3加强工程计量和控制工程付款
在工程施工过程中,一般大、中型工程项目执行按月或按阶段付款。付款时首先按照合同规定的施工内容进行计量,对于超合同范围和工程质量不合格的不予付款。另外在办理工程付款时,要注意及时扣回各种应付款项。
4.4加强合同管理减少工程索赔
建设合同是承发包双方进行工程建设、拨付工程价款、进行工程结算、工程索赔的依据,为此,必须把好合同的起草、审核、签订关,严格执行合同条款,减少不必要的纠纷和违约索赔。
5竣工结算阶段的造价管理
竣工结算是业主和施工单位都十分重视的工作,竣工验收、后评价阶段是建设工程的最后阶段,该阶段工程造价控制的主要内容包括竣工结算、竣工决算和保修费用的处理。工程造价咨询单位在这个环节上:一要核对竣工工程内容是否符合合同条件要求,工程是否竣工验收合格,合同中约定的结算方法、计价依据、取费标准、主材价格和优惠与承诺条件等。二要检查核对隐蔽工程验收记录,所有隐蔽工程均需进行验收,实行监理的工程要经监理工程师签字确认,隐蔽工程量要与竣工图相一致。三要落实设计变更签证,设计变更要有原设计单位负责人签字,并经建设单位和监理工程师签字,重大设计变更要经原设计审批部门审批,否则不应列入竣工结算。四要现场按竣工图、设计变更、现场签证进行工程量的核实。五要做到严格、合理、公平、公正。
6结语
项目成本控制能否取得预期目标的关键还在于项目施工成本管理体制和项目部在成本控制意识与措施正确性和合理性。工程造价的高低,直接反映着投资效益的好坏,充分体现了建设单位的工作质量和管理水平。所以,在工程建设中,建设单位必须把造价管理工作作为一项核心工作来抓,在工程实施进行的各个阶段,时时要有控制造价的经济头脑,发挥建设单位掌握第一手资料的优势,充分利用和认真分析建设周期中的重要信息,把握住市场经济的脉搏,减少或避免建设资金的流失,真正降低工程造价,提高经济效益。
参考文献:
1向鹏成,任宏. 我国工程造价管理的发展趋势及对策[J]中国工程咨询, 2003, (12) .
2李广新. 工程造价的合理确定与控制措施[J]. 科技创新导报, 2008, (08) .
3宋波. 建筑工程造价管理探讨[J]. 科技创新导报, 2008, (09) .
关键词:建设单位,工程造价,造价管理
Abstract: the engineering cost is usually referred to as a project construction cost for all expenses incurred. Therefore, the administration is in many aspects, including the construction unit, the design, the construction unit, the unit of departments, etc. Construction enterprises are faced with fierce competition in the market, in order to in market competition to increase benefits, enhance the competitiveness of enterprises, must strengthen the construction process of cost control, construction stage project cost control through the whole construction process. On the analysis of the project cost control are based on the problems and reasons, strengthening the construction enterprise construction stage of cost control countermeasures.
Key words: the construction unit, the construction cost, cost management
中图分类号:TU723.3文献标识码:A 文章编号:
引言
项目是施工企业的成本中心,也是利润的主要来源。随着行业竞争日趋激烈,获利空间越来越小,施工企业都更加重视工程项目的工程造价及成本管理,把成本控制目标作为重要的考核指标。因此建设单位的工程造价的管理水平对控制投资起着至关重要的影响。建设单位对工程造价的管理要贯穿于工程建设的全过程,即包括建设工程的立项决策阶段、设计阶段、招投标阶段、施工阶段、竣工结算阶段,下面针对上述五个阶段分别进行论述:
1决策阶段工程造价的管理
在这一阶段对工程造价的管理重点是积极参与项目决策前的准备工作,认真搜集有关资料,如设备运行情况、设备技术参数、需要解决的问题、工程实施后的效益分析、编制工程投资估算等。一方面力求编写的立项申请具有较强的说服性和可行性,争取早日立项。另一方面力求编制的投资估算尽可能全面,充分考虑到施工过程中可能出现的各种情况及不利因素对工程造价的影响,使投资估算真正起到控制项目总投资的作用。可见,项目决策阶段的工程造价管理并不仅仅是职能部门的事,作为建设单位应积极参与工程造价管理,充分发挥自身的作用。
项目经理部首先以中标“标书”为依据确定项目的目标成本。根据设计图纸和有关技术资料,对项目的特点和实施方法等进行认真的研究分析,并运用价值工程原理,制定出科学先进、经济合理的施工方案。其次根据目标成本,以分部分项目工程实物工程量为基础,编制具体的分步实施的项目成本计划,为今后的成本控制作好准备。最后编制现场经费预算,进行分解后以责任成本的形式落实下去,为今后的成本控制和绩效考评提供依据。
2设计阶段工程造价的管理
初步设计是设计过程中的一个关键性阶段,也是整个设计构思基本形成阶段。从现行的基本建设程序上讲,可行性研究后,提出项目建议,审批后,建设方委托有相应资格的设计单位进行初步设计,设计单位根据项目的功能及其要求,来初步确定项目的总图规划、单体以及相关的配套规划,以达到项目的功能。在这样的初步设计中,多数是由规划师、建筑师及相关专业的工程师来完成,而造价工程师很少介入,由于实施的人不具备造价专业知识,对影响工程造价方面的因素考虑自然不全面,往往容易造成一些不必要的浪费。如由于地质条件的差异、由于结构选型的差异、场内土石方平衡的差异等造成的工程造价不必要的增加和浪费。
3项目招标过程中的造价管理
工程招标投标包括设备、材料采购招投标和施工招投标两个方面,通过招投标建设单位选择施工单位和材料供应商,这对项目投资乃至质量、进度的控制都有至关重要的作用。笔者认为,在招标过程中成本控制,建设单位应注意与加强以下几点:
(1)招标工作应遵循公平、公开、公正、诚信的原则。招标前,应严格审查施工单位和材料供应商的资质,必要时进行实地考察,避免“特级企业投标,一级企业转包,二级企业进场”等不正常现象,这对项目成本控制非常不利。
(2)做好招标文件的编制工作,造价管理人员应收集、积累、筛选、分析和总结各类有价值的数据、资料,对影响工程造价的各种因素进行鉴别、预测、分析、评价,然后编制招标文件。对招标文件中涉及费用的条款要反复推敲,尽量做到“知己知彼”,以利于日后的造价控制。
(3)合理低价者中标。目前推行的工程量清单计价报价与合理低价中标,作为建设单位应杜绝一味寻求绝对低价中标,以避免投标单位以低于成本价恶意竞争。所谓合理低价,是在保证质量、工期前提下的合理低价。
4实施阶段工程造价的管理
4.1制定合理工期是控制施工项目成本的关键
施工工期是一种有限的时间资源,在项目管理中有特定的价值,即“工期价值”。对工程项目而言,工程的质量、成本和工期是施工管理的三大主线,工期是否合理直接影响着施工质量和成本,因此,施工项目管理中的时间管理非常重要。
当施工工期变化时,会引起工程劳动量(人工与机械)的变化。市场中的物价是波动的,材料价格会随工期的长短而不同。因此,同一工程项目,工期不同,工程成本就不同。因此,合理的施工进度安排,能最大限度地缩短工期,将减少工程费用,使施工单位获得较好的经济效益。
4.2工程材料价格管理
工程材料价格管理是工程造價管理的重点,也是难点。“市场形成价格”这一理论要求我们正确对待价格信息。为了控制工程造价,应主动去了解市场,控制工程造价,走向市场,了解比较多家材料供应商的产品质量和价格,筛选出几家质优、价廉的材料、设备供应商,并与这些供应商建立长期的联系,及时了解材料、设备的价格变化情况,同时,适时掌握周边商家的材料、设备价格情况。认真研究拟采购的材料、设备的技术问题,认真推敲合同的技术条款从而能较好的控制材料、设备的质量和价格,杜绝因设备采用、安装问题对今后造成不良影响,合理控制工程造价。
4.3加强工程计量和控制工程付款
在工程施工过程中,一般大、中型工程项目执行按月或按阶段付款。付款时首先按照合同规定的施工内容进行计量,对于超合同范围和工程质量不合格的不予付款。另外在办理工程付款时,要注意及时扣回各种应付款项。
4.4加强合同管理减少工程索赔
建设合同是承发包双方进行工程建设、拨付工程价款、进行工程结算、工程索赔的依据,为此,必须把好合同的起草、审核、签订关,严格执行合同条款,减少不必要的纠纷和违约索赔。
5竣工结算阶段的造价管理
竣工结算是业主和施工单位都十分重视的工作,竣工验收、后评价阶段是建设工程的最后阶段,该阶段工程造价控制的主要内容包括竣工结算、竣工决算和保修费用的处理。工程造价咨询单位在这个环节上:一要核对竣工工程内容是否符合合同条件要求,工程是否竣工验收合格,合同中约定的结算方法、计价依据、取费标准、主材价格和优惠与承诺条件等。二要检查核对隐蔽工程验收记录,所有隐蔽工程均需进行验收,实行监理的工程要经监理工程师签字确认,隐蔽工程量要与竣工图相一致。三要落实设计变更签证,设计变更要有原设计单位负责人签字,并经建设单位和监理工程师签字,重大设计变更要经原设计审批部门审批,否则不应列入竣工结算。四要现场按竣工图、设计变更、现场签证进行工程量的核实。五要做到严格、合理、公平、公正。
6结语
项目成本控制能否取得预期目标的关键还在于项目施工成本管理体制和项目部在成本控制意识与措施正确性和合理性。工程造价的高低,直接反映着投资效益的好坏,充分体现了建设单位的工作质量和管理水平。所以,在工程建设中,建设单位必须把造价管理工作作为一项核心工作来抓,在工程实施进行的各个阶段,时时要有控制造价的经济头脑,发挥建设单位掌握第一手资料的优势,充分利用和认真分析建设周期中的重要信息,把握住市场经济的脉搏,减少或避免建设资金的流失,真正降低工程造价,提高经济效益。