论文部分内容阅读
兖州矿业(集团)公司东滩煤矿选煤厂设计入选能力400万t/a。根据矿井发展计划,跳汰入洗600万t/a。该厂通过对洗煤系统的分析,研究了技术改造方案。
Yanzhou Mining (Group) Company Dongtan Coal Preparation Plant design selected capacity 4 million t / a. According to the mine development plan, jig 6 million t / a. The plant through the analysis of coal washing system, studied the technical transformation program.