论文部分内容阅读
日照港装卸设备容量大、效率高,合理组织生产对搞好节能工作极为重要。为此,日照港要求生产调度人员在安排生产时,要尽量避开照明灯峰期,将装卸作业尽量安排在夜间和清晨,同时制定严格的装卸效率指标考核办法,并加强了现场巡视工作,发现问题及时整改,使全局各单位都积极开展了设备经济运行,克服了过去那种在设备选型
Rizhao Port handling equipment capacity, high efficiency, rational organization and production of energy-saving work is very important. To this end, Rizhao Port requires production scheduling staff to arrange production, try to avoid the peak lighting, loading and unloading operations as far as possible arranged at night and early morning, at the same time to develop a rigorous loading and unloading efficiency index assessment methods, and strengthened on-site inspections, Find problems timely rectification, so that all units in the world have actively carried out the operation of equipment economy, over the past that in the equipment selection