成都火车站新建站房大楼的候车大厅为两层建筑,分设中间大厅及东、西两侧厅。中间大厅长、宽各36m;东、西两侧厅各宽36m,长64m,再加上四周的出檐,大厅屋盖的总宽度为46.8m。总长度为176.4m。候车大厅要求
The waiting hall of the Chengdu Railway Station New Station Building is a two-story building with separate middle halls and halls on the east and west sides. The middle hall is 36m long and 36m wide. The east and west halls are each 36m wide and 64m long. Together with the surrounding exits, the total width of the hall roof is 46.8m. The total length is 176.4m. Waiting hall requirements