论文部分内容阅读
This paper presents a new development scheme of simultaneous injection and production in a single horizontal well drilled for developing small block reservoirs or offshore reservoirs.It is possible to set special packers within the long completion horizontal interval to establish an injection zone and a production zone.This method can also be used in steam flooding after steam soak through a horizontal well.Simulation results showed that it was desirable to start steam flooding after six steam soaking cycles and at this time the oil/steam ratio was 0.25 and oil recovery efficiency was 23.48%.Steam flooding performance was affected by separation interval and steam injection rate.Reservoir numerical simulation indicated that maximum oil recovery would be achieved at a separation section of 40-50 m at steam injection rate of 100-180 t/d; and the larger the steam injection rate,the greater the water cut and pressure difference between injection zone and production zone.A steam injection rate of 120 t/d was suitable for steam flooding under practical injection-production conditions.All the results could be useful for the guidance of steam flooding projects.