京杭运河万寨港是目前我国吞吐量最大的内河煤炭出口港之一,属“七五”期间国家重点建设工程,在1958年已建部分工程的基础上续建,历时4年,现已基本竣工,即将验收、投产。本文介绍该港口工程概要以及设计中的主要技术问题,其中总平面布置、装卸工艺、旧有建筑物的检测、鉴定和修复以及大面积的采用钻孔灌注桩技术等供读者在工程实践中参考。
The Wanhang Port of Beijing-Hangzhou Grand Canal is one of the inland coal export ports with the largest throughput in China at present. It belongs to the state key construction project during the “Seventh-Five-Year Plan” period and was built on the basis of some projects already completed in 1958, which lasted for four years. Completed, about acceptance, put into operation. This paper introduces the outline of the port project and the design of the major technical issues, including general layout, loading and unloading process, the detection of old buildings, identification and repair, and a large area with the bored pile technology for readers reference in engineering practice .