辽宁核电站初步可行性研究报告审查会于1984年3月13日至3月16日在辽宁省兴城县召开,来自全国40余单位84名代表参加了会议。会议听取了东北电力设计院的“辽宁核电站初步可行性研究报告”。地矿部沈阳地矿所、辽宁省地震局、辽宁省环保局等单位还分专题进行了介绍。会议划分三个专业组分三个专业组:地震地质组,环境保护组,总平面布置及交通组,进行了分组审查讨论。辽宁核电站规划容量为360万千瓦(4个堆×90万千瓦)一期工程180万千瓦,暂
The review meeting for the Preliminary Feasibility Study Report of Liaoning Nuclear Power Station was held in Xingcheng County, Liaoning Province from March 13, 1984 to March 16, 1984. Eighty-four representatives from more than 40 units across the country attended the meeting. The meeting heard the “Preliminary Feasibility Study Report of Liaoning Nuclear Power Station” of the Northeast Electric Power Design Institute. The Department of Geology and Mineral Resources of Shenyang Institute of Earthquake, Liaoning Province Seismological Bureau, Liaoning Provincial Environmental Protection Bureau and other units also introduced topics. The conference divided three professional groups into three specialized groups: Seismological Geology Group, Environmental Protection Team, General Plane Arrangement and Traffic Group, and conducted group review and discussion. The planning capacity of Liaoning nuclear power plant is 3.6 million kilowatts (4 piles×900,000 kilowatts) and 1.8 million kilowatts of the first phase of the project.