论文部分内容阅读
一、编制过程根据铁道部1973—1975年标准化工作三年规划,由株洲电力机车研究所、大连机车车辆工厂、上海通信工厂、哈尔滨炬光制灯厂组成的《机车电器基本技术条件》、《机车电测量指示仪表技术条件》、《机车硅整流装置技术条件》部标准起草小组以及《内燃、电力机车照明灯泡灯具简统化》部通用件制订小组,于1974年12月至1976年5月,总结了十
First, the preparation process According to the Ministry of Railways 1973-1975 standardization of three-year plan, by the Zhuzhou Electric Locomotive Research Institute, Dalian locomotive and rolling stock factory, Shanghai Communication Factory, Harbin torch light plant composed of “basic technical conditions for locomotives,” “ Locomotive electrical measuring instrumentation technical conditions ”,“ locomotive silicon rectifier device ”standard drafting group and the“ internal combustion, electric locomotive lighting bulb simplification ”Department of common parts development group, in December 1974 to May 1976 , Summed up ten