论文部分内容阅读
在伟大领袖毛主席“备战、备荒、为人民”的战略思想光辉指引下,为发展我国石油化学工业,加速社会主义建设,奋战三个月,试制成功了一台3万6千吨乙烯装置用LT185-13-1型裂解气压缩机。经空负荷试车,运转情况良好。 全机分高压段、中压段和低压段三个单行机组,共分五段,其中低压段包括一、二、三段共6个叶轮,中低段为第四段共有3个叶轮,高压段为第五段共有4个叶轮。其结构形式为高压、中压、低压三个机组基本相同,仅在尺寸大小、压力、温度、转速和
Under the glorious guidance of Chairman Mao’s strategic thinking of “preparing for war, preparing for war and for the people”, and for three months in a bid to develop China’s petrochemical industry and accelerate socialist construction, a 36,000-ton ethylene plant LT185-13-1 cracking gas compressor. After empty load test run, running in good condition. The whole machine is divided into three sections: high-pressure section, medium-pressure section and low-pressure section. There are totally six impellers in the low-pressure section, including three impellers in the fourth and fourth sections, Paragraph for the fifth paragraph of a total of four impeller. Its structure is high pressure, medium pressure, low pressure three units are basically the same, only in the size, pressure, temperature, speed and