上海电业管理局在去年第四季整頓檢修工作的基础上,今年上半年又进一步大抓檢修工作,以保証安全經济地发供电。今年上半年檢修的設备容量,超过以往任何一年的同时期,仅一、二月份檢修的即占設备总容量的三分之一。与去年相比較,今年上半年机炉大修容量已超过去年全年大修容量。上半年已完成的鍋炉檢修容量为年計划的58.6%,汽輪发电机檢修容量为年计划的71.3%。在供电方面已完成全部220千伏、110千伏及35千伏綫路的檢修;对35千伏及23千伏电纜部分作了恢复性大修或进行了耐
On the basis of rectifying the maintenance work in the fourth quarter of last year, the Shanghai Electric Power Administrative Bureau further carried out major repair work in the first half of this year to ensure safe and economic power supply. The capacity of equipment overhauled in the first half of this year exceeded the same period in any previous year. Maintenance in January and February only accounted for one third of the total capacity of the equipment. Compared with last year, the overhaul capacity of the furnaces in the first half of this year exceeded the annual overhaul capacity. The boiler maintenance capacity completed in the first half of the year is 58.6% of the annual plan, and the turbine generator maintenance capacity is 71.3% of the annual plan. Complete repair of all 220 kV, 110 kV and 35 kV lines in power supply; Restorative overhaul or resistance to 35 kV and 23 kV cable sections