研究目的:贵阳南编组站扩建工程是全路最复杂的编组站扩建项目之一,机务设备在编组站内的布局直接影响编组站总图布置、机车走行路径和距离,对编组站快速有效组织运输起很重要作用。本文通过对贵阳南编组站车流组织、机车作业流程和既有机务设备的研究,目的是找出编组站扩建工程中机务设备布局和工程实施的合理方案。研究结论:检修利用既有机务段,运用采用分设方案,即新建贵阳南派驻机车折返段、改建既有贵阳机务段。该方案充分利用了既有机务设备,机车作业流程顺畅、走行距离短、节省运营费、施工过渡工程实施性好、并预留了远期发展条件。
Research purposes: The expansion project of Guanyang South Marshalling Station is one of the most complex Marshalling Station expansion projects in the whole road. Layout of locomotive equipment in Marshalling Station directly affects layout of Marshalling Station general layout, locomotive travel path and distance, It plays an important role. Through the research on the flow organization, locomotive operation process and existing maintenance equipments of Guiyang South Marshalling Station, the purpose of this paper is to find a reasonable solution for the layout of equipment and engineering implementation in the marshalling station expansion project. Research conclusions: Overhaul and utilization of the existing depot, the use of sub-program, namely the new Guiyang South sent locomotive folding section, reconstructing the existing Guiyang locomotive depot. The program makes full use of the existing mechanical equipment, locomotive operating flow smoothly, walking distance is short, save operating costs, construction of the transition project implementation is good, and set aside long-term development conditions.