文章以兰渝铁路嘉陵江特大桥(48+3×60+48)m连续梁工程为依托,介绍了连续梁施工过程中遇到的问题及其处理措施,供类似工程应用借鉴。
Based on the 48 + 3 × 60 + 48 m continuous beam girder project of Lanzhou-Chongqing Railway Jialing River Bridge, this paper introduces the problems encountered in the continuous beam construction process and its treatment measures for reference of similar projects.