我公司2500m~3高炉上料系统采用双机带式运输机传送,在其转运站中,采用翻板4实现运料从一条输送带2向另一条输送带转运(图1)。翻板4上安装衬板5。烧结矿从上一层输送带经漏斗收集后,直接落在衬板5上,落差2m。对衬板5造成强烈冲击。衬板5磨损严重,试用多种耐磨材料,效果均不理想。用我厂专门试制的高铬铸铁衬板,kmT-BCr15Mo2DT(厂内牌号)也仅用20天左右即报废,这不到60天的设计寿命。经过试验,我选用高铬铸铁为材料,将原设计的平面型材板改为L形(见图2)。给衬板增加一个直角边,根据衬板的工作位置,取H=
The 2500m ~ 3 blast furnace feeding system of our company adopts the double-deck belt conveyor to convey. In its transfer station, the vane 4 is used to transport the material from one conveyor belt 2 to another conveyor belt (Figure 1). Flip 4 to install liner 5. Sintering conveyor from the previous collection by the funnel, fell directly on the liner 5, the gap 2m. Strong impact on the liner 5. Liner 5 serious wear and tear, try a variety of wear-resistant materials, the effect is not satisfactory. With our special trial of high-chromium cast iron liner, kmT-BCr15Mo2DT (factory grade) is only about 20 days that is scrapped, which is less than 60 days design life. After testing, I chose high-chromium cast iron as the material, the original design of the plank to L-shaped plate (see Figure 2). To the liner to add a right-angle edge, according to the lining of the working position, take H =