我矿690中段运送废石及副产原用8S梭车和0.75m3矿车。由于掘进系统全面展开,又增添了2m3侧卸式矿车,为此。必须改造固定式2m3卸载曲轨.1 加固曲轨底面改造后的曲轨是能整体平移的活动式。要满足5320mm长的活动曲轨对卸载时的强度和刚度的要求,?
I mine 690 mid-section of the delivery of waste rock and by-product of the original 8S shuttle car and 0.75 m3 car. As the tunneling system in full swing, also added 2m3 side dump truck, for which. Must transform the fixed 2m3 unloading track. 1 Reinforced the bottom of the curved track after the transformation of the track is able to move the overall translation. To meet the activities of 5320mm long curved rail unloading the strength and stiffness requirements?