水电站运行和机电設計学术討論会

来源 :水利水电技术 | 被引量 : 0次 | 上传用户:LJ619
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
[本刊訊] 中国水利学会和中国电机工程学会联合举行的水电站运行和机电設計学术討論会,于1964年11月15日至廿三日在成都召开。与会代表学习了党中央、毛主席提出的各行各业工作都要实現革命化的指示,认識到要作好科学技术工作的革命化,首先要人的思想革命化和坚持四个第一;同时,在会議中还貫彻了“百花齐放、百家爭鸣”的方針。这样,使会議有了一个良好的思想基础。通过8天的会議,交流 [News] China Hydraulics Society and the China Institute of Electrical Engineers jointly held hydropower station operation and mechanical and electrical design seminars, in November 19, 1964 to 23 held in Chengdu. The delegates learned from the instructions of the party Central Committee and Chairman Mao that all walks of their work must be revolutionized and realized that in order to revolutionize science and technology work, we must revolutionize people’s ideology and adhere to the four firsts At the same time, the policy of “letting a hundred flowers blossom and a hundred schools of thought contend” was also implemented in the conference. In this way, the conference has a good ideological foundation. Through 8 days of meetings, exchange
其他文献
1962年12月10日至26日,水利电力部在北京召开了全国水利会议。这次会议的主要任务是:根据党的八届十中全会“关于进一步巩固人民公社集体经济、发展农业生产的决定”,全面分
本文介绍了钢板、水泥双层蜗壳和三夹层蜗壳的模型试验结果。双层蜗壳试验指出,在同样的内压作用下,内层钢蜗壳的最大边界应力由于外层钢筋混凝土的工作,减小约20~25%;层间压力
在动力系统的电源规划设计中,我们经常要进行水、火电方案选择的技术经济计算,以决定水、火电站开发的经济合理性。方案比较的基础是参加比较的若干个水、火电站开发方案具
陕西省交口抽水灌区的广大干部和社员,为尽快地扩大灌溉面积,建设稳产高产农田,争取1965年农业更大丰收,在已获得灌溉效益的基础上,以不断革命精神,大抓工程的续建、扩建和
上海郊区是个老河网地区,一般每隔100~300米就有一条河浜,西通太湖,北接长江,平均年降水量有1100余毫米,水源充沛,但雨量分布不均,夏秋两季往往出现大旱和暴雨,有时连续70余
“鳉鱼无论再怎么努力,也变不成金鱼的”。立川谈志毫无隐瞒地向谈春揭示了这一无情的现实,同时也以让谈春几人一起升为二等演员的决定告诉他们,即便不是金鱼,鳉鱼也有活着的
丹江口水利枢纽在党的英明领导与总路线的光辉照耀下,通过十万劳动大军的努力,第一期基坑工程已胜利完成,第二期围堰截流工程并在1959年12月26日高速度的胜利合龙。目前已进
我们一共参观了三省(区)41处山区、丘陵区和6处感潮区的水轮泵扬水站。根据这些站的资料统计,水工建筑物造价占建站总投资的比重很大,一般为40%~80%以上,因此,总结、研究如何
根据已有的研究成果,三门峡水库增建泄流排沙设施以后,黄河下游河道的淤积将是相当严重的。针对这一问题,有些同志建议,在黄河下游两岸进行大规模的放淤,以改良土壤,增加农
一、大头壩分期蓄水施工应力问题 (一)问题的提出较高的大头壩(和重力壩)施工期需2—5年之久,在我国目前水利建设大跃进的形势下,水库的拦洪和发电都非常迫切,因此,要求在壩