论文部分内容阅读
石家庄热电厂地处河北省会石家庄市东北隅的工业区中心位置,以体育北大街为界,分为东西二部:西为老厂,五十代初建成;东为新厂,1988年始建,现仍在施工中。该厂为热电联产企业,承担发电和向工业区各企业、单位及居民供热任务。有12台锅炉运行生产,采取灰渣混合排放,水力管道输送方式将灰渣排到贮灰场或综合利用厂。两座贮灰场设在市东北方滹沱河南岸,南北毗邻,容积910万立米,已存灰300多万吨。
The Shijiazhuang Thermal Power Plant is located in the center of the industrial zone in the northeastern corner of Shijiazhuang, capital of Hebei province. It is divided into the east and the west by the sports north street. It is an old factory in the west and was completed in the early 50s; it is a new plant in the east and was built in 1988. Still under construction. The plant is a combined heat and power company that undertakes the task of generating electricity and heating to businesses, units and residents in the industrial park. There are 12 boilers that are in operation and production, and ash and slag mixing and discharge are adopted. The hydraulic pipeline transports the ash to the ash storage yard or comprehensive utilization plant. The two ash yards are located on the south bank of the city’s northeastern river, adjacent to the north and south, with a capacity of 9.1 million cubic meters, and have stored more than 3 million tons of ash.