论文部分内容阅读
某军港码头的鱼雷检测总车间内。“预先准备!”中队长一声令下,操作手边复诵口令,边卸下鱼雷螺旋桨、雷头等保护外罩,然后对动力、引信、自动导向、方向控制等部分进行调试检查。随后,鱼雷组装联调开始了,雷身对接、仪器联接、气密检查、数据测试、打防锈油……一连串紧张有序的动作后,装上潜艇即可发射的“水下杀手”齐刷刷地就位,浑圆的雷体发出寒光。
A military port of torpedo testing headquarters. “Prepared!” The squadron commander, the operation hand recite password, remove the torpedo prop, Lei Tou and other protective cover, and then power, fuze, automatic steering, direction control and other parts of the commissioning inspection. Subsequently, the assembly of the torpedo assembly began, the thunder body butt, instrument connection, air tightness check, data testing, anti-rust oil ... ... a series of intense and orderly action, mounted on the submarine can launch “underwater killer” Qi Brushed in place, round the shiny body issued a cold.