HI-13 tandem accelerator was running well in 2010, some works were doing well in maintenance and development. This year the machine has been operated 4 000 hour
In SEE ground simulation experiments, wide beam whose size is similar to the ICs can be used for measuring the Single-Event Effects (SEE) cross section curves b
In the decommissioning of Jinan MNSR, it’s required to dismantle and disaggregate radioactive facilities,such as beryllium reflectors, irradiation tubes, upsid
Experiments concerned with the Quasi Macroscopic Neutron Noise Analysis Technique were carried out using the system developed by our laboratory on the Uranyl Ni